Tir Coed, Gwesyllt

Home > Completed Projects > Tir Coed, Gwesyllt

A development of 23 one, two and three bedroom houses and bungalows in timber frame construction. The site required a full cut and fill exercise including the placement of 130 linear metres of Gabion Basket retaining walls. Foundations are traditional strip footings incorporating a beam and insulation infill ground floor slab system to achieve greater U-Values. . Designed to EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted to each house. The client is a registered Social Landlord. Commenced in April 2023, Completed October 2024.

  • worker wearing helmet drilling the ground
  • dumper truck unloading gravel
  • areal view of houses and bunglows from above
  • Aerial shot of properties Gwersyllt
  • areal view of Gwersyllt, Woodlands Farm
  • Aerial shot of properties finished properties Gwersyllt
  • Aerial shot of finished properties Woodland Gwersyllt
  • Aerial shot of finished properties Woodland Gwersyllt
  • Aerial shot of finished properties Woodland Gwersyllt
  • Aerial shot of finished properties Woodland Gwersyllt

All projects