Cwrt Pentwmpath, Llay
Home > Ongoing Projects > Cwrt Pentwmpath, Llay
A development of 17 apartments and 8 bungalows on the site of a former warden-controlled apartment scheme.
The development involved the demolition and site clearance of the former apartment block.
The New construction Comprises Timber frame for the Bungalows and a hybrid steel/timber frame construction for the apartment block, Foundations are traditional strip footings incorporating a beam and insulation infill ground floor slab system to achieve greater U-Values. Designed to achieve EPC A, All units are fitted with Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels. Commenced in August 2024, slated for completion March 2026.
The Client is a Registered Social Landlord.
- Machinery aerial shot by drone Cwrt Pentwmpath, Llay
- Castlmead Site Photo
- aerial shot of a digger on site
- beginning of the brick laying
- red digger with a worker in hi vis with a shovel
- worker in green hat and hi vis holding a shovel
- man in a orange digger lifting up dirt
- aerial shot of the brick ground works
- worker in green hat on a yellow machine on the site
- worker in green hat pushing a machine over dirt
- Cwrt Pentwympath - construction site from the air - Castlemead Construction
- Workers busy at Cwrt Pentwympath , Llay
- Fondations being laid a Cwrt Pentwympath, Llay
- Shot from the air of steal beams being placed at Cwrt Pentwympath, Llay
- Overview of the site at Cwrt Pentwympath, Llay