Glan Y Mor, Colwyn Bay.
Home > Ongoing Projects > Glan Y Mor, Colwyn Bay.
A development of 54 one and two bedroom apartments over five floors on a constrained town centre site. The scheme involves the demolition of existing Victorian properties and construction of the new apartment block in concrete and timber frame. The foundation system is a complex piled Raft system with concrete Lower and upper ground floors with a timber frame structure above. Designed to Achieve EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted for each apartment. The communal spaces feature roof terraces and a low level garden with Sustainable urban Drainage features. The client is a registered Social Landlord. Commenced in April 2024, Slated for completion January 2027.
- Bay View Road Colwyn Bay, buildings being demolished
- House being demolished with a large excavators
- digger demolishing a house
- terraced house being demolished with a excavators
- aerial view of workers and machinery on site
- aerial view of workers and machinery on site
- orange digger on the construction site
- aerial shot on the construction site with machinery
- drone shot of the construction site
- machinery digging dirt on the site
- Castlemead Group Construction laying foundations at Glan y Mor, Colwyn Bay.
- Drone footage showing site where Castlemead Group Construction laying foundations at Glan y Mor, Colwyn Bay.
- From the air, Castlemead Group Construction laying foundations at Glan y Mor, Colwyn Bay - town in the background.
- Castlemead Group Construction laying foundations at Glan y Mor, Colwyn Bay - work is progressing
- Looking up at a large crane - Castlemead Group Construction laying foundations at Glan y Mor, Colwyn Bay.