Heol Dirion, Colwyn Bay
Home > Ongoing Projects > Heol Dirion, Colwyn Bay
A development of 27 one, two and three bedroom houses and bungalows in timber frame construction.
Foundations are traditional strip footings incorporating a beam and insulation infill ground floor slab system to achieve greater U-Values.
Designed to EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted to each house.
The client is a registered Social Landlord.
Commenced in October 2026, Slated for completion April 2028
- Close view of an orange digger digging the ground at Heol Dirion, Colwyn Bay
- Close view of a wall made of rocks at Heol Dirion, Colwyn Bay
- Close view of an orange digger working at Heol Dirion, Colwyn Bay
- View of the ground that's been levelled to start the building phase at Heol Dirion, Colwyn Bay
- Aerial view of the construction site at Heol Dirion, Colwyn Bay
- Aerial view of people working with diggers at Heol Dirion, Colwyn Bay
- Aerial view of the area Castlemead will be building at Heol Dirion, Colwyn Bay
- Long aerial view of the area where Castlemead will be working with green fields in the background
- Long aerial view of the construction site with materials that will be used to flatten the floor
- Aerial view of the houses and trees that is around the construction site at Heol Dirion, Colwyn Bay









