Heol Dirion, Colwyn Bay

Home > Ongoing Projects > Heol Dirion, Colwyn Bay

A development of 27 one, two and three bedroom houses and bungalows in timber frame construction.

Foundations are traditional strip footings incorporating a beam and insulation infill ground floor slab system to achieve greater U-Values. 

Designed to EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted to each house. 

The client is a registered Social Landlord. 

Commenced in October 2026, Slated for completion April 2028

  • Close view of an orange digger digging the ground at Heol Dirion, Colwyn Bay
  • Close view of a wall made of rocks at Heol Dirion, Colwyn Bay
  • Close view of an orange digger working at Heol Dirion, Colwyn Bay
  • View of the ground that's been levelled to start the building phase at Heol Dirion, Colwyn Bay
  • Aerial view of the construction site at Heol Dirion, Colwyn Bay
  • Aerial view of people working with diggers at Heol Dirion, Colwyn Bay
  • Aerial view of the area Castlemead will be building at Heol Dirion, Colwyn Bay
  • Long aerial view of the area where Castlemead will be working with green fields in the background
  • Long aerial view of the construction site with materials that will be used to flatten the floor
  • Aerial view of the houses and trees that is around the construction site at Heol Dirion, Colwyn Bay


All projects