Maes Bodlondeb, Aberystwyth

Home > Residential > Ongoing Projects > Maes Bodlondeb, Aberystwyth

A development of 18 one, two and three bedroom houses in timber frame construction.

Foundations are traditional strip footings incorporating a beam and insulation infill ground floor slab system to achieve greater U-Values.

Designed to EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted to each house.

The client is a registered Social Landlord.

Commenced in January 2026, Slated for completion November 2027

  • a small wall along a wall of dirt
  • jcb working on groundworks
  • jcb working on the Maes Bodlondeb site
  • jcb dumoing things into a back of a lorry
  • jcb working on the Maes Bodlondeb site
  • Maes Bodlondeb building site
  • drone image from above Maes Bodlondeb
  • aerial view of the work going on at Maes Bodlondeb
  • 2 machinery doing ground works
  • all the machinery on the Maes Bodlondeb site
  • drone view of Maes Bodlondeb
  • aerial view of Maes Bodlondeb site


All projects