Maes Bodlondeb, Aberystwyth
Home > Residential > Ongoing Projects > Maes Bodlondeb, Aberystwyth
A development of 18 one, two and three bedroom houses in timber frame construction.
Foundations are traditional strip footings incorporating a beam and insulation infill ground floor slab system to achieve greater U-Values.
Designed to EPC A, Air Source Heat pumps (ASHP), Mechanical Ventilation heat Recovery (MVHR) and Photovoltaic Panels (PV) Panels fitted to each house.
The client is a registered Social Landlord.
Commenced in January 2026, Slated for completion November 2027
- a small wall along a wall of dirt
- jcb working on groundworks
- jcb working on the Maes Bodlondeb site
- jcb dumoing things into a back of a lorry
- jcb working on the Maes Bodlondeb site
- Maes Bodlondeb building site
- drone image from above Maes Bodlondeb
- aerial view of the work going on at Maes Bodlondeb
- 2 machinery doing ground works
- all the machinery on the Maes Bodlondeb site
- drone view of Maes Bodlondeb
- aerial view of Maes Bodlondeb site